dighalloween

dighalloween

Hallowe'en Rift, Mendip Hills

Excursions [and other notes] involved in the exploration of Hallowe'en Rift; a cave, so far, formed within Triassic Dolomitic Conglomerate.

The exploration of Hallowe'en Rift was started in 1982 by Trevor Hughes with other members of the Bristol Exploration Club, then during the early 1990's Vince Simmonds and other, mostly, local diggers were active at a number of locations within the cave, including the start of the present dig with Graham Johnson in December 1991. The current phase of exploration was commenced in 2009, with the majority of the early work being carried out by Vince Simmonds and Alex Gee, now the regular team includes Rob 'Tav' Taviner, Graham 'Jake' Johnson, Nick Hawkes, Matt Tuck, Jonathon Riley, Paul 'Brockers' Brock, Roz Simmonds, Duncan Price and Mike Moxon. There has been occasional help from others including Mike Willett, John 'Tangent' Williams, Pete Bolt, Bob Smith, Callum and Hazel Simmonds, with regular guest appearances by that well-known antipodean, Ray Deasy.

24th February 2019

digging 2019Posted by Vince Simmonds Sun, February 24, 2019 21:11:18

Solo

Another glorious day weather-wise and it was a warm walk up the hill to the cave with kit. Lowered the bags down the entrance, then pushed them through to the north-west passage. There, the bags were clipped together to form a train and I dragged them through to the other side of the pinch-point. It took a bit of organisation to arrange the kit neatly in the somewhat confined space. The drilling was a tad awkward, so I sank some pilot-holes in the required spots. I managed to snap a drill-bit but luckily, I had another one. I took a lot more care finishing the 4no. holes with a 550mm drill-bit. All the holes primed and tamped, kit packed away and the bags, carefully, pushed through the pinch-point, I pulled the hauling line out of the way too. All wired up the mornings task was bought to a satisfactory conclusion on the surface. Disturbed a couple of pheasants. Hopefully, there will be some more rock for the wall to clear out next weekend.

That’s phase one of dismantling the ‘backstop’ to allow the free movement of people and materials to pass unhindered between the north and south completed.



  • Comments(0)//dighalloween.mendipgeoarch.net/#post489